Plumbing · Whole-Home Repiping

Whole-Home Repiping in Nashville, Franklin & Murfreesboro

Done patching leaks? We replace the old, failing pipe running through your home with modern PEX or copper, so you stop fixing the same problem twice.

Airstream Services fleet of service vans ready for solar panel installation and support across Middle Tennessee.
Whole-Home Repiping in Nashville, Franklin & Murfreesboro

Signs your home needs to be repiped

Not every leak means a full repipe. But if a few of these sound familiar, the pipe itself is the problem and patching won’t fix it:

The pipe types we replace most

A lot of Middle Tennessee homes were built with pipe that’s now known to fail. Here’s what we find and why it has to go.

Pipe typeWhen it was installedWhat it looks likeWhy it fails
Polybutylene About 1978 to 1995 Grey (sometimes blue) flexible plastic No longer manufactured. Fails without warning and was the subject of the Cox v. Shell class-action settlement. (documented by InterNACHI)
Galvanized steel Before about 1970 Dull grey threaded metal Rusts from the inside out, which chokes pressure and turns water brown.
Kitec (less common) About 1995 to 2007 Orange and blue plastic with brass fittings Recalled. The fittings corrode and the line can burst.

Where we see old pipe across Middle Tennessee

These are the areas with the most homes from the galvanized and polybutylene eras. Not sure what you’ve got? We’ll identify it on the spot.

Plenty of polybutylene out in Antioch, Hermitage, and Bellevue from the 80s and 90s, plus pre-1970 galvanized in East Nashville, Madison, and the older core neighborhoods.

Historic downtown Franklin is full of pre-1970 galvanized, while the building boom in Brentwood and around Cool Springs left a lot of polybutylene behind the walls.

Older homes near the Square and MTSU lean galvanized. The subdivisions built from the late 80s through the 90s, plus Smyrna and La Vergne, are prime polybutylene territory.

PEX or copper? We'll help you choose

Both are solid. We lay out the trade-offs and let you decide based on your home and budget.

 PEXCopper
CostLowerHigher
InstallFaster, fewer connectionsSlower, more labor
Freeze resistanceFlexes, handles cold betterCan split if frozen
Best forMost homes todayHomeowners who prefer the proven standard

What to expect

We assess

We check your pipe, your water, and your layout, then identify exactly what you have.

You get the quote

A clear, upfront number with the work explained. No surprises later

We repipe

New pipe goes in through small, targeted access points. Most homes finish in a day or two.

We test & clean up

We pressure-test the system, patch access points, and walk you through what changed.

Financing Made Simple with Service Finance

Repiping questions, answered

Polybutylene is grey (sometimes blue) flexible plastic, usually installed between 1978 and 1995. Galvanized is dull grey threaded metal found in homes built before about 1970. If you’re not sure, we’ll identify it for you during the assessment.

Most homes are done in one to two days. Larger or more complex homes can take a little longer, and we’ll tell you what to expect up front.

No. We make small, targeted access points instead of opening everything up, then patch them when we’re finished and keep the cutting to a minimum.

Yes. It’s no longer manufactured and is known to fail without warning, so if your home still has it, replacing it is a when, not an if.